Annual Output of 10 million Sets of Bicycle Flywheel Production Line Project Completion Environmental Protection Acceptance Publicity


According to the relevant provisions of the environmental protection acceptance procedure for the completion of the construction project, the environmental protection acceptance of the completion of the 10 million sets of bicycle flywheel production line project produced by Cixi Kangdi Vehicle Industry Co., Ltd. is announced as follows:

Project name: annual output of 10 million sets of bicycle flywheel production line project

Construction unit: Cixi Kangdi Vehicle Industry Co., Ltd.

Construction site: No.30, Xinpujiang Road, Xinpu Town, Cixi City

Construction Content: The total investment of the project is 42 million yuan, new equipment is added, and the project of annual output of 10 million sets of bicycle flywheel production line is implemented. The main production of bicycle flywheel (including cover, inner core, tooth and shell), the total production capacity of 10 million sets. In December 2017, the environmental impact report form of "annual output of 10 million sets of bicycle flywheel production line project" was commissioned and approved by Cixi Environmental Protection Bureau in January 2018 (cihuanjian No. 2018-8).

Main environmental protection measures:

1. Exhaust gas

Shot blasting dust: after the equipment comes with a bag for dust removal, it is discharged through a 15m high exhaust pipe with a processing air volume of 14000m.3/h。

Oil washing exhaust gas: 15 meters after the fume purifier treatment.

2. Waste water

The drainage system adopts rain and sewage diversion system, and the rainwater in the plant is directly discharged into the rainwater pipe network in the plant area after being collected by pipes, and finally discharged into the attached inland river. Domestic sewage is connected to the municipal sewage pipe network, and finally enters the sewage treatment plant in the north of Cixi City, and is discharged after being treated to meet the standard in the first-level standard of "Discharge Standard for Pollutants from Urban Sewage Treatment Plants" (GB18918-2002).

3. Noise

Enterprise noise is mainly generated during the operation of various machinery, equipment noise. ① Selection of low-noise equipment, regular equipment maintenance; ② punch, shot blasting machine and other high-noise equipment, arranged in the workshop, improve the production workshop sound insulation and noise reduction capacity, as far as possible to ensure that the workshop closed during production.

4. Solid waste

The results of solid waste acceptance can be found in the website of Cixi Branch of Ningbo Ecological Environment Bureau.

Publicity period: from October 22, 2019 to November 19, 2019 (20 working days), the public can log in to the attachment to inquire about the acceptance report of the project. If the public has any opinions and suggestions on the construction project, they can be reflected to the construction unit within the publicity period. Please leave your contact information (name, address, telephone number or E-mail) for timely reply and feedback.

Name of Employer: Cixi Kangdi Car Industry Co., Ltd.

Contact: Cen Zong

Telephone: 13968221222

Previous Page

Next Page

Related News


Annual Output of 10 million Sets of Bicycle Flywheel Production Line Project Completion Environmental Protection Acceptance Publicity

Cixi Kangdi Vehicle Industry Co., Ltd. Annual Output of 10 million Sets of Bicycle Flywheel Production Line Project Completion Environmental Protection Acceptance Publicity